The top addition & subdivision case study involves creating distinct living units by subdividing the existing structure of the house in the vertical axis AND adding an addition to the top of the existing home. Interior walls are added to create the necessary rooms within each unit and demising walls are added between units to create necessary fire separations. The project introduces new kitchens and bathrooms for each unit. Major considerations include plumbing, fire separation, and unit access.
# of Units: 1
Existing House
4 Bed / 2 Bath
107.3 sqm (+107.3 sqm basement and garage)
# of Units: 5
Unit 1 – Ground Floor – Front
1 Bed / 1 Bath
52.1 sqm
Unit 2 – Ground Floor – Rear
1 Bed / 1 Bath
49.3 sqm
Unit 3 – Top Addition
2 Bed / 1 Bath
60.5 sqm
Unit 4 – Basement
2 Bed / 1 Bath
75 sqm
Shared Spaces
Laundry
Mechanical Room
Whatever you are deciding what type of unit to add, it is important to understand what the major cost considerations are. For a top addition and conversion project, these are: